BOM
It would benefit the technician if we could see the bill of material (BOM) on the work order for that specific piece of equipment. This was good on efactory 2.0.
3 votes -
Change Priority in Period Capacity to Scheduler
Allow sites to change priority on a task from the period capacity screen in the scheduling portal. This would allow us to be able to move it to the current week without having to go back and forth between the P/S role and the Tech role.
5 votes -
Vista previa de imagenes
Tener vista previa de las fotos subidas, sin tener que descargarlas.
2 votes -
Unit of measure on req/po and the ability to issue parts out by unit of measure
include a drop down for unit of measure on REQ (EA,CS,PCK,BX,LB, etc.) allowing definition by SCS what quantity they are requesting. There then should be a place to define how many units per case and this information should be recorded under the "Supplier parts" tab under the "Parts" section of the system. Once item is received in, you should be able to issue part by unit of measure (EA,CS,PCK,BX) allowing for more accurate inventory and PO receipt relation as well as inventory actual cost on hand information.
4 votes -
Sort field for Asset ID on daily capacity
Add Assets ID for sort field on daily capacity
7 votes -
When Parts Arrive For Work Orders
When Parts Arrive For Work Orders Let The Assigned Tech Know With An Automated Email
1 vote -
Daily capacity
40-hour jobs should fill week out when assigned – Once assigned to one tech the week is filled vs having to create 5 tech slots to fill week
7 votes -
Color Change for rescheduled tasks
Different color (Orange) for items being rescheduled – When assigning tasks from previous week into daily capacity a visual identifier would help
6 votes -
Daily Schedule Portal Task Hyperlink
Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc.
6 votes -
Make Feedback two-way
During feedback review, would be nice to be able to reply to feedback to submitter via email directly from P/S portal.
2 votes -
Customer Sign-in
Portal login screen asks for email address where the customer logs in; it should ask for site number or user name.
2 votes -
I-Pad FM Tasks Creation
I-Pad not able to create FM type tasks
2 votes -
PM status change option in planner portal
Can the supervisors or planners have the ability to cancel work orders in the planner portal, either in the daily capacity or period capacity views?
Also, an alternative to "Cancel" missed PM's, since they were not technically cancelled. I don't mind the extra time it takes since it shouldn't be easy. But a better option that more accurately reflects the situation:
Missed-Customer - Due to customer constraints
Missed-Maintenance - Example, equipment not found, low staff, etc
Skipped - Example, in shop for repairs, awaiting parts, etc.To show in the drop down window with Cancel, Cancel-Duplicate, etc.
Just more robust…5 votes -
Include Teams as option in control center.
Description :
eFactory Pro 3.0 Portal - Control Center, Can we either have "team" or an option for "external team" added to the conditions to set up a new rule.1 vote -
Need to add "NDA EARLY AM" to delivery type menu when processing requisitions.
Need to add "NDA EARLY AM" to delivery type dropdown menu when processing requisitions. This would help with enhancing communication because there are scenarios when "EARLY AM" is needed versus just "NEXT DAY". It's known that the buyer typically selects delivery type when processing req. into POs, but to help enhance communication, the SCS should be able to select delivery type as part of req. processing. If the urgency changes during the transition, then buyer can update as needed.
4 votes -
Error de suministro de aire
Si la maquina no activa el aire, la causa mas probable es que el sistema electrico no hace el aterrizamiento de la corriente directa el voltaje a tierra a el sumistro de energia, en este caso el boton de paro hace la intermitencia de ese aterrizamiento.
1 vote -
Free text space
Free text note filled in period capacity, i.e. offsite – able to add notes as needed from week to week
3 votes -
BOM Expansion
On the parts tab have a tab/dropdown for listing all parts on the BOM
4 votes -
PO GNS Receipt Improvement
When booking in GNS parts is it possible to remove the "Total Cost" field? The reason being is that it does not make any difference to the total, no matter what value i put in this box. Therefore we are all wasting our time every time we book in a GNS part when we fill in this field.
9 votes -
"Change Over" added to the Customer and Tech Portal screens
"Change Over" column added to the Customer and Tech Portal screens with a "Y/N"
Customer and Operations could filter for Change Over jobs quicker than pulling a report everyday and filtering to find new change over jobs that have been entered.
10 votes