eFactoryPro 3.0
270 results found
-
Requerimos acceso a Informe laboral acomulado, con la actualizacion ya no tuvimos acceso
Requerimos acceso a Informe laboral acomulado, con la actualizacion ya no tuvimos acceso
1 vote -
Adding Attachments after Reviewed Status
Adding Attachments after WO is reviewed/closed out
1 vote -
Revert to original portal search/sort features vs filters
The filters are extremely inefficient. Also, filters takes away the ability to see examples of what is included in the column.
4 votes -
When a workorder is scheduled for more than one person it shouldn't be able to be closed out until everyone has closed their section.
When a workorder is scheduled for more than one person it shouldn't be able to be closed out until everyone has closed their section. The way it is now once someone closes it the others who haven't put their time in do does not get their time accounted for.
3 votes -
headers to big
all of the 'Header' boxes are too tall , when you open a ticket Half the screen is just headers.
even viewing the works order / tasks/ parts etc. screen the headers take up a third of the screen.1 vote -
parts location
we need parts location on parts used
3 votes -
Bin location having parent bin location
Having the ability to add parent loc (ex. aisles) so that when you are running a cycle count you can run it for the parent location (ex. aisle) rather than having to input each specific bin location. This would help sites with larger crib inventory to reduce time wasted bouncing around the crib.
We have 484 bin loc on our K aisle (7944 total bins currently). If we could generate our cycle count by the K aisle this would allow us to break our cycle counts down more and run it for the whole month rather than having to run…
1 vote -
display
Can you have the option of saving personal preferences
3 votes -
Filter Fix
WO/Task filter need to be reworked. Sometimes it works but most times when you type in a specific workorder or task number it just comes up with a full list of either one.
2 votes -
Correcting Parts Used within the WEM Review Process
Having the capability to correct Parts Used during the reviewing WEM process.
1 vote -
Make Criticality emergency-1 the default when customer is creating reactive W/O
When customer is creating a work order they hardly pick the level 1-emergency schedule breaker, if default was level 1 we would have less of a chance of it getting overlooked in the daily schedule.
1 vote -
Asset ID Update
The system utilizes both a equipment number (which I'm assuming is a primary key for the equipment file) and the asset ID. If that is the case, why can't the Asset ID be updated during work order review without a major overhaul to the work order by deleting information off the task first?
1 vote -
Search options
Bring back the search options from the last versions.
1 vote -
Codigos de reparacion
A mi punto de vista , esta buena la idea de mejora el sistema , pero creo prudente que cada sitio debe de tener sus códigos de reparación ya que en cada sitio las maquinas son diferentes y por ende el refaccionamiento es diferente . ademas de tener mas claro la información en la base de datos
1 vote -
Make more User friendly Group List
Option to adjust group list to have most used at top of list by as set by individual user.
Ex: -RIW -RIW: Phase 1 ..... I dont need these at the top of my list having them at top pushes the groups i use lower down.2 votes -
Parts Needs Forecast
A report that will look at all needed materials on all open PMs, show the availability (in stock or not) and the pm compliance dates. This would help with kitting and verifying all needed parts are at least on order for future PMs with customer promise dates prior to compliance due dates.
3 votes -
list Task# on feedback
Description :
eFactory Pro 3.0 Planner/Scheduler portal - Job Plans, Job plan feed back. Please add Task# to Feedback.Job plans are used on multiple assets and work orders. Sometimes feedback is machine specific. The list of feedback for any given job plan does not list the Task# that the feedback was entered on. With hundreds of work orders using the same job plan in a given month, it becomes very difficult to validate the feedback.
4 votes -
Mass Cancel tasks in Ready Backlog
Allow sites to mass cancel open tasks from the Period capacity screen that are no longer needed or past PM dates.
6 votes -
Technicians wish to see compliance window in My Schedule
Technicians have requested the ability to see the compliance window on the My Schedule view in the new system. This will allow for corrections in case the supervisor or planner schedule the PM incorrectly.
13 votes -
Period Capacity Select all feature
Select all on period capacity – able to select all will be able to move all over to execution faster
11 votes
- Don't see your idea?