SCS should not have the ability to perform a manual cost change for parts in the eFP Client
SCS should not have the ability to perform a manual cost change for parts in the eFP Client.
5 votes -
Part Status Icon located on work order's reserved parts listing.
Place a button along with "View Part Bin Info, Consume Part Need, Edit Part Need, and Cancel part need" that would query the parts need table and return if the req was released, due date, and tracking number for shipment.
21 votes -
Add to shift turn over report if a task was marked as PROACTIVE
Hi, there´s no reports in SSRS that shows if a task was marked as PROACTIVE. This information will help a lot to the Planners & Schedulers if they want to see quickly which task are PROACTIVE, not just the Pm´s, PD´s and FM´s. I request add this information in the Shift Turn Over report and in Labor report.
14 votes -
Options on Timezones/timestamps.
Provide option to change timezone in SSRS reporting system for shift turnover report.
1 vote -
Review work order by technician
I would like to review work orders by Technician
1 vote -
YTD Part Receipt Drill Down
I would like to be able to drill down in the YTD Part Receipt under the 4 blocker in the supply chain metrics. i.e. Select HVAC>drill down and have it populate a list of everything purchased under that HVAC piece.
1 vote -
SISTEMA PERMITE BORRAR O MODIFICAR UNA TAREA YA COMPLETADA
Al momento de completar una tarea, cualquier persona que no haya participado en la tarea puede modificar y/o borrar horas de mano de obra, notas etc, favor de colocar candados ya que se puede perder informacion valiosa
1 vote -
Estimacion de tiempos desde Portal
Poder agregar el tiempo estimado de una actividad desde el EfactoryPro 2.0 ya que hacerlo desde el Cliente demora demasiado tiempo, cuando seria mas eficiente desde el portal.
En cuanto a los Mantenimiento Preventivos que el sistema pueda estimar el tiempo de ejecución calculando las ultimas 3 ejecuciones y la cantidad de personas.1 vote -
RCA Trigger App on Power BI
All sites should have an RCA trigger Document filled out by this point. Being able to create a report or app on power bi to quickly see if any RCA's have been triggered in the current month is a great time saving tool. Can we have a template created that sites can then use that addresses safety, Failure count, Downtime, Cost, etc. in accordance with the RCA Trigger Template from the Standards and Assessments page?
a mock up has been created at this link:
https://app.powerbi.com/groups/me/reports/40e32eec-836a-4f7c-baa9-32f0dc704dc4?ctid=786b8a42-d6d2-45f9-ac36-b35652395f2a5 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! Our Power BI analyst team is looking at your suggestion and determining how we could implement this.
-
Repair code - object
Repair codes - object
Can “eyelet” be added to the drop down list?2 votes -
Add Planned and Actual Labor Columns to the Task Grid in the Portal
Please add Total Planned Labor minutes and Actual Labor to the basic technician report.
1 vote -
move the + up 1/2"
not a fan of the red plus sign in the middle of no where. it has no sensible reason to be by itself halfway in between the header and main body of the page.
1 vote -
Down & Reduced in Tasks
Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.
11 votes -
Add Wire rope/cable for Hoist
There are not ODC codes for a Wire Rope cable for Hoist or tool balancers.
1 vote -
Adding the parts section to the WO print out
It would be beneficial for the Techs if the parts need section appeared when a WO is printed. Currently there is a part used section, and I would think that we could add a sub set in this section of the print out.
6 votes -
Date Planned Removed and Planned Start Date added to the Supervisor filter for unassigned and assigned tasks.
Date Planned Removed and Planned Start Date added to Supervisor filter for unassigned and assigned tasks.
2 votes -
CREATE A PROPER CATERGORY FOR SAFETY REOCURRING TASKS
CREATE A TASK TYPE CATERGORY FOR REOCURRING SAFETY RELATED TASK (SAR'S). THIS IS FOR SITES THAT ARE INVOLVED WITH THEIR SITE SAR AND SAFETY PROGRAMS. MAKING IT EASIER FOR ATS EMPLOYEES TO CATERGORIZE AND AVOID A NEGATIVE IMPACT ON MPRO AND PM METRIC.
2 votes -
Serial Number on printout
When printing out a work order some things are omitted on the printout that appear on the computer screen. One of them is the machine serial number; I'd like that added to the printout.
1 vote -
Add Predictive Maintenance to report. Currently only providing Preventative Maintenance information.
PM List Report
1 vote -
way to label issues Mechanical or electrical
would make assigning work orders and for tech to find tickets that fit their skill set if there was a drop down that allowed for identification.
3 votes